top of page

MARINE – CRUISE SHIPS

  • Gas freeing of engine room fuel tanks during dry-dock campaign

  • One (1)  80m3  Diesel Oil fuel tank, to less than 10PPM in 1 hour 42 minutes.

  • One (1)  100m3 Oil overflow tank to less than 10PPM in 50 minutes. 

  • Maintenance workers were able to carry out hot work in the vicinity of these tanks without interruptions from potential spikes of the explosive levels in these tanks.

  • NanoVapor suppression kept the tanks within the OSHA approved threshold level for man entry into confined spaces.

bottom of page